Client: Hartsfield-Jackson Atlanta International Airport
Market: Airport Infrastructure
Areas of Expertise: Erosion Control and Earthwork
Duration: 5 months
Total Value: Under US$500,000
Contract Date:6/17/2002
.
The storm water detention basins are designed to collect storm water and regulate the volume of water exiting. There are five storm water detention basins at Hartsfield-Jackson Atlanta International Airport.
The project consisted of cleaning and clearing the basins to increase their holding capacity and prevent the run-off of sediments towards the natural channels. In addition, the recovered areas were grassed.
|